Fig. 7From: Balancing and reconciling large multi-regional input–output databases using parallel optimisation and high-performance computingThis plot visualises the residual norms of the ACIM code for the Eora problem. A maximum of 100 Cimmino iterations were allowed between two Hildreth iterations. Both the Cimmino- and the Hildreth iterations were terminated when a residual norm of less than 100 was achievedBack to article page