Skip to main content

The Official Journal of the Pan-Pacific Association of Input-Output Studies (PAPAIOS)

Table 6 Project performance indicators

From: Impact and cost–benefit analysis: a unifying approach

  Construction Operation Present values at 10% discount
Project costs 100 245 322.73
Value added increase 103.05 378.36 447.02
NNP increase 97.9 359.45 424.67
VA/costs 1.03 1.54 1.39
NNP/costs 0.98 1.47 1.32